Monday, August 8, 2011

House Update #6

  The house is coming along.  Sometime this week the low-fi guys should be done putting in all the data and t.v  plugs in, and all the other stuff they do.  After that we will hopefully get our framing inspection done in a timely manner, and then we can move onto drywalling.  In the meantime more work on the outside should be getting done.  All the subflooring on the decks are on, so those need to be finished off.  The siding was put on in a hurried fashion, so that it has to be taken off and installed correctly.  After that's done the house needs painting of course.  That's pretty much where we are at.  Hopefully we will be done sometime in October.  
This is the fireplace in our master, and my feet reflected in it.

The subflooring is all in on the master deck.

The sliding door is in off the bedroom in the basement.

The inside view of the sliding glass doors.

There was a small bench wrapped around the basement family room, and we had them tear it out for more real estate down their.

1 comment:

SSToone said...

Even though I am not sure how to comment on each one of these, I LOVE the updates and they are very interesting. Keep them coming! Fun to see such progress toward something new and exciting!