  When we came back from Hawaii we were really excited to see all the things that had happened to the house while we were gone.  The most notable work was done on the exterior.  Stacked stone was added to the front of the house, and the old single front doorway was expanded to accommodate a double door.  The current front door is basically a filler door until the real one arrives.  Basically all that needs to be done before we can put up the drywall is the low voltage guys need to come in and put in all the t.v. jacks, data plugs, cameras, and other electrical thingumabobs.


The A.C. unit is in!

The deck has all its sub floor in place, and was covered up because of the rain.  It's going to be finished up with concrete pavers.

The shower unit is in the basement's three quarter bath.  The tub has also been put in  the girls' bathroom on the main floor.

Eventually this is going to be a sliding glass door leading to the basement patio from the bedroom down there.

In the master bedroom the fireplace has been framed out.

The powder room in the basement has been framed out.