Sunday, July 10, 2011

House Update #3

The house is really coming  along.  They are pretty much done with the plumbing now, so we are now concentrating on getting our deck done, finishing the wiring, putting in a new steel I beam in the great room, and the duct work for our air conditioning.
There is drywall in our garage! We were excited to see this small patch of drywall anywhere in the house.

This is new framing in the basement that I was excited to see.

This is the new window that will be in our shower unit in the full bath  on the main floor.

Duct work up in the master suite for our air conditioning because we love us  some air conditioning.

The giant dirt pile in the basement is now replaced with this smaller dirt pile in the basement.

These are the new washer/dryer hookups in our master closet since only having laundry in the basement was going to mean a long walk downstairs.

They moved the washer/dryer hookups in the basement.  The hookups were right when you walked in the door before, so the door would have banged into the washer or dryer every time.  Someone wasn't thinking when they originally laid out the laundry room.

No comments: