Tuesday, November 15, 2011

House Update #14

   This last week a lot of progress was made on our master bathroom.  All the tile was laid on the floor, and one accent wall of tile was done. Our vanity was also put in place.  In general house news, all the doors are hung, and trim is up around almost all the doors and windows.  The flooring came in at last, and is busy sitting around the house acclimating. It will have to sit around for about a week before it can be installed.  It will be a Christmas miracle if we are in the house before Christmas; although it could be possible.  More realistically we will probably be moving in around New Years.

These are the doors they put in the master suite.

This is our closet.

Here's a view of the vanity and flooring.  On the right, the pipes that are sticking up are the plumbing for our tub that will be installed eventually.

Here's a better look at our accent wall.  It's glass mosaic tile.

Here's our shower waiting for it's time of tile glory.



1 comment:

Rachael said...

Your closet and shower look like big huge bedrooms!