Hopefully this is the last update I do of the house's progress. It's going to be a nail biter. The kitchen is practically done. The counter tops were installed, and they are beautiful except they are all covered up right now. The appliances need to be installed and the back splash needs to be finished. We've only had five doors up in the house the entire time we've been living here because we painted them all, and this last week all the closet doors were put up. The hardware on the doors has also been changed. Both fireplaces are tiled. The built-ins were painted and so was the office, so everything is white upstairs now. The tile work in the master bathroom is done too.
Closet doors. How novel. |
Avery was sad that our glorious gold curlicue handles were replaced with these better designed handles. |
Here's the kitchen with the counter tops and most of the back splash in. |
Here's a close up of our back splash. |
This is the living room fireplace. |
This is the office with all the trim painted white now, and the boxes are some of the kitchen appliances. |
The built-ins in the family room look a million times better. |
Our master bedroom is still home to doors. |
Here's the master shower. |
A close up of the shower. |
Here's the vanity with the counter top on. |
3 comments:
It looks amazing! I want to come see it!
Loving it all!
It looks amazing!
Post a Comment